Skip to main content
The ladder · Lesson 10

10 Change by the team standard

Product EngineerSoftware Factory Engineer

Product Engineer · Academy CRMAcademy CRM: a Contact details page, taken through the pipeline.

I want to make a change follow the team's standard: a person works out the intake, then agents build fast.

Change by the team standard

Concepts​

The team's standard becomes a pipeline that stops for people.

  • Standard — Academy CRM's rule for new pages: no build before a reviewed specification, UI specification and technical design.
  • Intake — the three Design steps of Spec first, each ending in your review.
  • Request — a Question or Review in the Inbox: pick an answer, or Approve, Send back or Stop run.
  • Round — one more try after a send-back; the card counts them.
  • Verification report — the result of each check of the run, kept with the work item.
  • Live page — an operational artifact an agent writes for people: a Grill page, a summary.

How a team standard runs

Standard
Intake
Request
Live page
no build before reviewed documents
three steps, each ending in your review
a Question or Review in the Inbox
an operational artifact for people
  1. Standard
    no build before reviewed documents
  2. Intake
    three steps, each ending in your review
  3. Request
    a Question or Review in the Inbox
  4. Live page
    an operational artifact for people

Figure 10.1 · How a team standard runs

Scenario​

You start a User Story with Spec first, answer its Question, review the three intake documents and send one back once. The build runs under web-change. You grill the result, read a summary page and merge.

The change

Intake
Build and check
Grill and summary
Merge
  1. Intake
  2. Build and check
  3. Grill and summary
  4. Merge

Figure 10.2 · The change

Interface​

A work item while its run waits for you. The numbers are the places the walkthrough sends you.

Walkthrough​

Scene 1 of 12 · Read the standardWatched 0%

Scene 1 of 12 · 0:21

Read the standard

Where: A run that waits for you: ⑤ Pipeline tab

Academy CRM's rule for new pages: no build before a reviewed specification, UI specification and technical design. Spec first, from lesson 9, enforces it: three Design steps, each ending in your review, then the build under web-change.

Terms​

  • Spec first — the course pipeline that enforces the standard: it writes and reviews before it builds.
  • Suspend — pauses a live run. Stop ends it.
  • Rerun from here — runs a finished run again from that step.
  • Drives now — on the Pipeline tab: the agent that leads the chat once the run is over.
  • Open / All — the filters of the Inbox: what still waits for you, or every request.