11 Project agent
Product Engineer · Academy CRMAcademy CRM: the Activities feature, planned with the project agent.
I want the project agent to start and watch the work for me, by the same standard.
Project agent
Concepts
One agent files the work and watches it; the reviews and merges stay with you.
- Project agent — the agent of the whole project: it files work items, starts sessions and watches them.
- Project chat — your tabs with the Project agent; only you see them.
- Brief — its first message in a work item's chat; alone it starts no run.
- Pipeline for auto-start — the item's field that makes the agent's start a run.
- Awaiting confirmation — a card for an action past the merge policy; nothing happens until you press Confirm.
- Project tabs — tabs of the Project page that show main.
Who does what
- Project agentfiles work items, starts sessions, watches them
- Briefthe first message in a work item's chat
- Pipeline for auto-startthe item's field that makes the start a run
- Awaiting confirmationa card for an action past the merge policy
Figure 11.1 · Who does what with the Project agent
Scenario
The Project agent files a feature in two stories. You set each story's Pipeline for auto-start to Spec first. The agent starts story 1 as a run; you do the reviews, check, and tell it to merge. Then story 2.
A feature run by the Project agent
- Ask
- Set and start
- Check and merge
- Story 2
Figure 11.2 · A feature run by the Project agent
Interface
Three screens: the Project page with the Project chat and the project tabs; the Edit work item dialog of a story; a story's chat when its run is live. The numbers are the places the walkthrough sends you.
Project chat · how you get here: Project in the left column
Figure 11.3 · The Project chat and the project tabs
- 1Project: the Project page.
- 2Mine: the feature and its stories, with a dot when they work or wait.
- 3Chat tabs: your tabs with the Project agent.
- 4New tab: a new tab with the Project agent.
- 5History: your earlier tabs.
- 6Agent: its tool calls and answers; a card shows here too.
- 7Message box: your goal and your orders.
- 8Project tabs: Backlog, Logs, Code, Test: main.
- 9Add tab: Preview, Pipelines, Artifacts, Profiler and more.
Walkthrough
Scene 1 of 11 · 0:26
Ask for the feature
Where: Project chat: ① Project · ③ Chat tabs · ④ New tab · ⑦ Message box
Project in the left column. In the Project chat, + opens a New tab. Paste the message below; in its first line, put the address of your project page. In about a minute the Project agent answers with three links.
Copy:
This project is <paste the address of your project page here>
Create a feature «Activities: log a call» with two user stories under it, exactly as written:
1. «Log a call on a contact»: on the contact details page, a «Log a call» button opens a form with a date and a note; after Save the call shows on the page.
2. «List a contact's calls»: on the contact details page, a «Calls» section lists the contact's calls, newest first, with date and note.
Make story 1 the predecessor of story 2. Do not start anything yet: I set their pipeline first.
If you see instead
- The agent asks for the project id: send the first line again, with your project page's address.
Terms
- Watch — the Project agent's note to wake when a session's turn ends; the chat shows «you were woken by your watches».
- Main — the branch every merge lands on; the project tabs show it.
- Merge policy — the project's rules for a merge; a merge within them needs no card.