Skip to main content

Acceptance Criteria tab

Purpose​

The Acceptance Criteria tab shows how the work item proves it is done: each criterion with its last run and its evidence, the checks the agent ran, and your verdict on each result.

Where​

A work item → the + at the end of the tab row → Acceptance Criteria.

Screen​

Figure 1 · Criteria and their proof

  1. 1History: the sessions of this item.
  2. 2Verification summary: each check the agent ran, with its result.
  3. 3Review / Try to fix: your verdict on a result, or a fix by the agent.
  4. 4Message box: your messages; Queue message while the agent works.
  5. 5Tab row: Preview, Acceptance Criteria (AC), Pull request and more.
  6. 6Add tab: a missing tab: Test, Unit Test, Acceptance Criteria.
  7. 7Criteria and proof: last run and evidence; ⋯ at the right end of each row.
  8. 8Refresh status: works the coverage out again.
you controlthe agent doesSwifter shows

Shown in lesson 5, lesson 6.

What you can do​

Terms​

  • Try to fix — asks the agent to fix the checks that did not pass. (lesson 6)
  • Review — the work item type of a pull request review: it reads code and commits nothing. (lesson 21)