Skip to main content

Children tab

Purpose​

A feature groups the stories that build it. Its Children tab lists them, starts them one after another when Auto-start is on, and shows on a timeline which story waits for which.

Where​

A feature in the left column or the Backlog → the Children tab.

Screen​

Figure 1 · The feature and its Children tab

  1. 1New work item: the feature and the work items of this project.
  2. 2Pull requests: every pull request of the project.
  3. 3Overview: Analytics → Costs: the cost per work item.
  4. 4Mine: the feature and its stories; open a story here.
  5. 5Children: the tab of the feature's stories.
  6. 6+ (Add tab): adds the Children tab if the row lacks it.
  7. 7Auto-start and +: the switch, and + → Create work item for a new child.
  8. 8Timeline: one bar per story; the arrow joins S1 to S3.
you controlSwifter shows

Shown in lesson 7.

What you can do​

Terms​

  • Mine — your own open work items, in the left column. A dot marks an item that waits for you. (lesson 1)
  • Children — the work items under a parent, listed on its Children tab. (lesson 7)
  • Auto-start — the feature's switch that lets Swifter start a Ready child by itself. (lesson 7)