Children tab
Purpose
A feature groups the stories that build it. Its Children tab lists them, starts them one after another when Auto-start is on, and shows on a timeline which story waits for which.
Where
A feature in the left column or the Backlog → the Children tab.
Screen
Figure 1 · The feature and its Children tab
- 1New work item: the feature and the work items of this project.
- 2Pull requests: every pull request of the project.
- 3Overview: Analytics → Costs: the cost per work item.
- 4Mine: the feature and its stories; open a story here.
- 5Children: the tab of the feature's stories.
- 6+ (Add tab): adds the Children tab if the row lacks it.
- 7Auto-start and +: the switch, and + → Create work item for a new child.
- 8Timeline: one bar per story; the arrow joins S1 to S3.
you controlSwifter shows
Shown in lesson 7.
What you can do
- Write the feature — watch it in lesson 7.
- Add the first story — watch it in lesson 7.
- Add the second story — watch it in lesson 7.
- Add the third story after the first — watch it in lesson 7.
- Start two stories at once — watch it in lesson 7.
- Switch on Auto-start — watch it in lesson 7.
- Merge S1 — watch it in lesson 7.
- Update S2 from main, check it — watch it in lesson 7.
- Merge S2, then S3 — watch it in lesson 7.
- See the pull requests and the cost — watch it in lesson 7.